3p Logistics End 2022 with Oversized Facility Shipments
3p Logistics (3pl) saw their New Year concluding with the successful delivery of both oversized and project cargo for a new facility in Auvere for Enefit Power.
The company used two mobile cranes to unload the OOG cargo from ship to truck, as well as port cranes for unloading other packages up to 40 tons.
Route survey, unloading, port operations, transshipments, slingers, storage, permits, heavy transport, and other logistics processes were also carried out by 3pl.
The heaviest piece of cargo weighed over 170 tons. 3p Logistics’ team used a heavy 10-axle modular trailer with an extendable beam and ballast tractor to transport this.
3p Logistics loaded the following cargo from Port Sillamae in Estonia to Enefit Power Auvere Ida-Viru:
Cargo | Weight (tons) | Length (m) | Width (m) | Height (m) |
---|---|---|---|---|
Heat Exchanger | 58.2 | 9.4 | 3.0 | 3.7 |
Condensing Tower | 84.3 | 33.6 | 5.4 | 4.6 |
Oil Collection Vessel | 23.0 | 11.6 | 3.8 | 4.0 |
Air Cooler | 11.7 | 8.0 | 2.6 | 3.6 |
A total of 33 trucks were used to complete this shipment!
“We will continue to confidently participate in European energy projects in 2023.”
Please click here to view the full article on our official website.